Roofing provides free roof estimates. Whether it is a new
construction home or addition, a replacement roof system or
a roof repair, our qualified representatives stand ready to
meet with you and discuss their evaluation and cost
estimates with you.
Call or e-mail us at the
number listed on this page.
Or if you need to schedule
right away, fill in our on-line internet estimate request
form by clicking the link below
|
|
| Contemporary
style that lasts a lifetime
Metal Roofing fabricated and installed
by Covenant Roofing will outlast any other roof system on
the market today. Class A UL listed fire protection with a
wind uplift rating that exceeds Florida Building Code
(FBC) High Wind Area Standards
|
 |
From Key West
Village to Ultra Modern, Metal roofing is a becoming a
major presence in the best neighborhoods in South
Florida. Who can help but fall in love with the sleek
lines and sharp design possibilities? |
 |
Fabricated on
site for a custom look that takes your breath away, our
Standing Seam metal Roof System are more than just a
pretty face. Our roofs have backbone. Start with the
best self adhered water shield underlayment. Add our
Covenant Roofing exclusive roof details, and finish with
our Standing Seam roof panels. |
 |
All our
panels come with a patented Kynar 500 finish for a
lifetime of beautiful roof appearance. Our roof panel
coils have 6 times the thickness of automobile paint
jobs. For durability beyond any other roofing system,
Covenant roofing will fabricate and install a new
Standing Seam roof for you. |
|
954-530-0280
(954) 530-0239 Fax
info@southfloridaroofing.com
|
|
Keyword Search
Waiting
List |
 Once
I sign a contract with Covenant Roofing, how long does
it take before you start my job?
This is a question
we are often asked. Because it is the time of year
when the rains are soon to follow we have experienced a slight increase
in our roof estimates and new job scheduling. Right
now the wait is approx. 10 working days from the time
the contract is signed. Emergencies can be scheduled
sooner.
Is that too long to
wait? Not for a Honest Qualified Roofing Contractor
with numerous references who will do the job as if it
was his own home.
What
was the longest waiting list we have ever had?
In the
Summer of 1994 we had a 16 week backlog of work. Yes,
people waited for us. The owner of Covenant Roofing
refused to spread his employees too thin, as he puts
his name on every job we do. |
|